Greenspace logo
Welcome
Climate
  • Home
  • Policy & Reporting
  • Bulletin Board
  • Legal Register
    • Full Report
    • Calendar
    • Monthly Updates
    • Help
  • Docs
  • Policy & Reporting
  • Bulletin Board
  • »
    Legal Register
    • Full Report
    • Calendar
    • Monthly Updates
    • Help
  • Docs

Client Login

Legal Register - Climate

Environmental
  • Select Month:
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • March 2017
    • February 2017
    • January 2017
    • December 2016
    • November 2016
    • October 2016
    • September 2016
    • August 2016
    • July 2016
    • June 2016
    • May 2016
    • April 2016
    • March 2016
    • February 2016
    • January 2016
    • December 2015
    • November 2015
    • October 2015
    • September 2015
    • August 2015
    • July 2015
    • June 2015
    • May 2015
    • April 2015
    • March 2015
    • February 2015
    • January 2015
    • December 2014
    • November 2014
    • October 2014
    • September 2014
    • August 2014
    • July 2014
    • June 2014
    • May 2014
    • April 2014
    • March 2014
    • February 2014
    • January 2014
    • December 2013
    • November 2013
    • October 2013
    • September 2013
    • August 2013
    • July 2013
    • June 2013
Preview Email
March 2025
Congratulations. There are no changes to the legislation or other requirements in your legal register.
 
Recent Publications

New publications this month:

HEALTH AND SAFETY EXECUTIVE (HSE)

COSHH Essentials Guidance G404: Health surveillance for those exposed to respirable crystalline silica (RCS)

This guidance document has been refreshed by the HSE. Guidance is provided for employers and health surveillance providers.

 

Self-employed workers - Overview

The HSE has updated its guidance for self-employed workers.

 

RR1222: Face Fit testing of FFP3 respirators: the impact of sampling port location

This research report concerns the face-fit testing of filtering facepiece class 3 (FFP3) respirators. The research concluded that extended ports should be used for fit testing of FFP3 respirators.

 

Safety Notice: Risk of collision with offshore installations from attendant vessels

This notice has been issued in response to an increasing number of incidents where attendant ships have collided with offshore oil and gas and renewable energy structures. The problem is outlined alongside actions to be taken.

 

UK REACH Work programme 2024/25

This document sets out the HSE’s activities during the last year UK REACH has been in operation.

 

Storing and handling airbags and seat belt pretensioners safely

Guidance has been provided on the storage of airbags and seat belt pretensioners within the motor vehicle repair sector.

 

Building Safety Act 2022: Higher-risk Building Regime

New guidance on, or relevant to, the higher-risk building safety regime was published in March 2025, as follows:

  • Making changes to a higher-risk building project
  • Applying for a completion certificate
  • Building control approval for higher-risk buildings
  • Preparing information for a building control approval application
  • Building control bodies: professional codes and standards

The following HSE guidance on the higher-risk building safety regime was updated during March 2025. Many of the changes reflect the increased application charge of £302 for higher-risk buildings:

  • Manage a building control application for a higher-risk building
  • Applying to register a high-rise residential building
  • Apply for a building assessment certificate

 

MARITIME AND COASTGUARD AGENCY (MCA)

The following notes and notices relevant to occupational health and safety were published or updated during March 2025:

  • MGN 539 (M) Amendment 3 carriage of the code of safe working practices
  • MGN 608 Amendment 1 (M+F) Radio Survey Service: Authorisation
  • MIN 688 (M) Amendment 3 code of safe working practices: 2025 edition
  • MGN 702 (M) Amendment 1 Maritime autonomous surface ships of less than 2.5 metres in LOA
 
Offences

Fines after worker’s legs were trapped in a machine

A hydraulic hose and fitting company has been fined after a worker was trapped in a machine at a customer’s premises.

On 26 July 2023, an engineer was carrying out fault-finding on a customer’s laser-cutting machine. During the investigation, the cutting bed of the machine dropped and trapped both of his legs. After spending five weeks in hospital, the man had to have his right leg amputated above the knee. Despite extensive surgery to save his left leg, the man faces the possibility of having it amputated in the future.

An HSE investigation found that Pearson Hydraulics Ltd did not have a safe system of work in place for maintenance activities by its engineers at customer premises. The company failed to carry out a suitable and sufficient risk assessment of the work to be undertaken and failed to monitor and supervise the engineer's work. 

The investigation also identified that the worker had not been adequately trained by his employer and that his knowledge of hydraulic systems on laser-cutting machinery was inadequate, preventing him from carrying out the work safely.

HSE guidance stresses that it is important these work situations are properly assessed. Workers carrying out maintenance activities may need to undertake significant regular risk assessment (as the situation may develop and change in ways that could not be foreseen at the outset).

Breach

Pearson Hydraulics Ltd pleaded guilty to breaching Section 2(1) to the Health and Safety at Work etc Act 1974:

  • Section 2(1) applies a duty on every employer to ensure, so far as is reasonably practicable, the health, safety and welfare at work of all employees.

Penalty

Pearson Hydraulics Ltd was fined £96,333 and ordered to pay £10,701 in costs.

 

Scaffolding services company fined for unsafe scaffolding

A.I.M Access Solutions Ltd has been fined for failing to assemble safe scaffolding on a block of flats in Merseyside.

In May 2021, the HSE identified serious issues with the construction of the scaffold. The assembly instructions had not been followed while the scaffold tower was being built. No ladder was used to access the scaffold. Instead, workers climbed the rungs of the scaffold itself.

The HSE has published guidance on tower scaffolds. The HSE also states that incidents occur associated with this access equipment and are mainly caused by:

  • Defects in the erected scaffold: where the tower structure is incorrectly assembled or where a platform guardrail is missing; or
  • Erection and dismantling: The manufacturer, supplier or hirer has a duty to provide an instruction manual explaining the erection sequence, including any bracing requirements and the height to which the tower can be erected safely. This information must be passed on to the person erecting the tower.

The HSE investigation was prompted after the regulator was notified of the death of an A.I.M Access Solutions Ltd employee in May 2021. The prosecution of A.I.M Access Solutions Ltd was not brought on the grounds that the incident was causative of this employee’s death.

Breach

A.I.M Access Solutions Ltd pleaded guilty to breaching Section 2(1) and Section 3(1) to the Health and Safety at Work etc Act 1974.

Penalty

A.I.M Access Solutions Ltd was fined £30,800 and ordered to pay £5,040.75 in costs.

 

Company and director fined after excavation collapse

A company and its director have been fined after a man was injured during excavation work in West Sussex.

On 23 February 2023, the company was undertaking a full barn conversion, which included the installation of a new septic tank. To install the tank, workers had to dig an excavation approximately three metres deep. Three men had been tasked with doing the work.

The three men were in the hole, preparing to install a concrete base for the septic tank to sit on, when the walls collapsed.  One of the men was struck by falling soil, which resulted in multiple bone fractures and required him to be dug out.

An HSE investigation found that no precautions had been taken to prevent the collapse of the excavation, yet the men were expected to work in it.

HSE guidance advises that all work of this nature should be correctly planned, including whether any temporary support structures should be used. This may also include battering the excavation sides to make it safer.

Breaches

JHE Construction Limited pleaded guilty to breaching Regulation 22(1) of the Construction (Design and Management) Regulations 2015:

  • Regulation 22(1) requires all practicable steps to be taken to prevent danger to any person, including where necessary, the provision of supports or battering, to ensure that:
    • no excavation or part of excavation collapses;
    • No materials forming the walls or roof of, or adjacent to, any excavation is dislodged or falls; and
    • no person is buried or trapped in an excavation by material which is dislodged or falls.

The company director also pleaded guilty to breaching Regulation 22(1) of the Construction (Design and Management) Regulations 2015.

Penalties

JHE Construction Limited was fined £16,000 and ordered to pay £2,612 in costs.

The director was fined £2,000 and ordered to pay £1,000 costs.