Greenspace logo
Welcome
Climate
  • Home
  • Policy & Reporting
  • Bulletin Board
  • Legal Register
    • Full Report
    • Calendar
    • Monthly Updates
    • Help
  • Docs
  • Policy & Reporting
  • Bulletin Board
  • »
    Legal Register
    • Full Report
    • Calendar
    • Monthly Updates
    • Help
  • Docs

Client Login

Legal Register - Climate

Environmental
  • Select Month:
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • March 2017
    • February 2017
    • January 2017
    • December 2016
    • November 2016
    • October 2016
    • September 2016
    • August 2016
    • July 2016
    • June 2016
    • May 2016
    • April 2016
    • March 2016
    • February 2016
    • January 2016
    • December 2015
    • November 2015
    • October 2015
    • September 2015
    • August 2015
    • July 2015
    • June 2015
    • May 2015
    • April 2015
    • March 2015
    • February 2015
    • January 2015
    • December 2014
    • November 2014
    • October 2014
    • September 2014
    • August 2014
    • July 2014
    • June 2014
    • May 2014
    • April 2014
    • March 2014
    • February 2014
    • January 2014
    • December 2013
    • November 2013
    • October 2013
    • September 2013
    • August 2013
    • July 2013
    • June 2013
Preview Email
August 2023
Congratulations. There are no changes to the legislation or other requirements in your legal register.
 
Recent Publications

New publications this month:

DEPARTMENT FOR BUSINESS AND TRADE AND DEPARTMENT FOR BUSINESS, ENERGY & INDUSTRIAL STRATEGY

Indefinite recognition of CE marking for most goods in Great Britain

The government has announced that CE marking will continue to be recognised to place most goods on the market in Great Britain indefinitely. This concerns safety requirements on the following types of goods, where recognition had previously been due to end on 1 January 2025:

  • Machinery;
  • Pressure equipment;
  • Simple pressure vessels;
  • Personal Protective Equipment (PPE);
  • Equipment for potentially explosive atmospheres (ATEX);
  • Lifts;
  • Gas appliances;
  • Low voltage electrical equipment;
  • Equipment for use outdoors;
  • Pyrotechnics;
  • Recreational craft and personal watercraft;
  • Aerosols; and
  • Toys.

The extension also affects the following regimes:

  • Electromagnetic compatibility;
  • Non-automatic weighing instruments;
  • Measuring instruments;
  • Measuring container bottles; and
  • Radio equipment.

Notably the extension excludes construction products. Unless this policy changes, construction products will be required to conform to the UKCA requirement to be placed on the Great British market from 30 June 2025.

 

 

HEALTH AND SAFETY EXECUTIVE

Safety Notices

The HSE published two safety notices in August 2023:

  • Unsafe bolts on BendPak XPR series two-post vehicle lift
  • Wind turbine generator service lifts: risk of serious injury

 

 

DEPARTMENT FOR LEVELLING UP, HOUSING AND COMMUNITIES

Updated guidance regarding higher-risk domestic buildings

A range of guidance supporting the Building Safety Act 2022 was updated in August 2023:

  • Safety in high-rise residential buildings: Accountable persons 
  • Leaseholder and resident information on the Building Safety Fund
  • Register a high-rise residential building
  • Applying to register a high-rise residential building

 

 

OFFICE OF RAIL AND ROAD (ORR)

Approved list of systems excluded from the scope of the mainline railway ROGS requirements

This document lists systems that are not subject to mainline railway requirements under the Railways and Other Guided Transport Systems (Safety) Regulations 2006, as amended.

 

 

MARITIME AND COASTGUARD AGENCY (MCA)

The following Marine Guidance Notes relevant to occupational health and safety were published or updated during August 2023:

  • MGN 653 (M) Amendment 1 electric vehicles onboard passenger roll-on/roll-off (ro-ro) ferries
  • MGN 631 (M+F) Amendment 1: The merchant shipping (prevention of pollution by sewage from ships) regulations 2020

 

 

EUROPEAN CHEMICALS AGENCY (ECHA) (RELEVANT TO EU AND NORTHERN IRELAND)

35 hazardous chemicals added to the Prior Informed Consent Regulation

Regulation (EU) 2023/1656 applies export controls on 35 additional hazardous chemicals from 1 November 2023.

 
Offences

Company director fined for obstructing the HSE

A construction company and its director have been fined for a range of health and safety failings.

On 13 January 2022, HSE inspectors visited a timber-frame housing development under construction by Amro Construction Ltd in Meir, Stoke-on-Trent.

In court, the HSE enforcement lawyer said that the regulator had identified several health and safety failings, including the presence of an open flame gas stove amongst large volumes of combustible material, a lack of fire precautions, poor site security and inadequate washing facilities.

The HSE investigation found that Amro Construction Ltd had also failed to assess the on and off-site fire risks, despite it being a timber-frame project in a highly residential area. This was despite previous advice and enforcement from HSE in relation to the matter. As a result, the company failed to implement measures to prevent a fire from occurring or spreading, putting workers and members of the public at risk. The investigation also found the company had received previous enforcement in relation to the provision of adequate washing facilities.

During the course of the HSE investigation, the managing director of Amro Construction Ltd deliberately obstructed the inspector by refusing to provide information requested as part of his enquiries, causing a delay of several months.

Breaches

Amro Construction Ltd pleaded guilty to breaching Section 2(1) and Section 3(1) of the Health and Safety at Work Act 1974:

  • Section 2(1) requires employers to ensure, so far as is reasonably practicable, the health, safety and welfare at work of their employees.
  • Section 3(1) requires that employers ensure, so far as is reasonably practicable, that persons they do not employ who may be affected are not exposed to risks to their health and safety

The director pleaded guilty to breaching Section 33(1)(h) of the Health and Safety at Work Act 1974:

  • Section 33(1)(h) makes it an offence to intentionally obstruct an inspector exercising or performing their powers or duties.

Penalties

Amro Construction Ltd was fined £20,000 and ordered to pay costs of £1,587.

The director was fined £3,000 and ordered to pay costs of £1,935.

 

 

Farm fined after fatal electrocution by overhead power line.

A farm has received a fine after a tipped lorry operator was fatally electrocuted.

On 13 May 2021 the man was operating a tipper lorry at VB Farms LLP’s Littlecombe Farm in Crediton, Devon. The man was delivering stone that was going to be used to repair farm tracks by VB Farms LLP, when the hydraulic arm of the tipper lorry came into contact with an 11kV overhead power line. The man was electrocuted after exiting the lorry.

An HSE investigation found that VB Farms LLP had failed to carry out an assessment of how the work could be completed safely and did not consider the dangers involved with working near an overhead power line.

Overhead power lines typically carry electricity at voltages similar to the 11 kV in this case, but can go up to 400 kV. The HSE is concerned about a nationwide trend of farm machinery getting bigger, increasing the risk of contact with power lines.

Breaches

VB Farms LLP was found guilty of breaching Regulation 3(1) and Regulation 4(3) of the Electricity at Work Regulations 1989 following a trial at Exeter Magistrates’ Court:

  • Regulation 3(1) makes it the duty of every employer and self-employed person to comply with the regulations in so far as they relate to matters that are within their control.
  • Regulation 4(3) requires that every work activity, including operation, use and maintenance of a system and work near a system, shall be carried out in such a manner as not to give rise, so far as is reasonably practicable, to danger.

Penalty

VB Farms LLP was fined £60,000 and ordered to pay costs of £11,715.

 

 

Manufacturer fined after worker seriously injured through entanglement in a machine

A manufacturing company has been fined after a worker became entangled in a machine.

The man had been working for Mountfield CNC Ltd at the firm’s site in Droitwich when the incident took place on 4 January 2022. The man had been setting up a CNC machine when he became entangled with the machine’s rotating saw. This led to the man suffering a fractured neck, resulting in him becoming paralysed from the chest down.

An HSE investigation found that Mountfield CNC Ltd had failed to take effective measures to prevent access to dangerous parts of the CNC machine. The machine was fitted with interlocked guards, but the interlocks had been defeated before the incident, allowing the machine to move without guards in place. The company should have identified the need for effective interlocking guards and monitored safeguards to ensure they had not been tampered with.

Breach

Mountfield CNC Ltd pleaded guilty to breaching Section 2(1) of the Health and Safety at Work Act 1974.

Penalty

Mountfield CNC Ltd was fined £18,000 and ordered to pay costs of £3,094

 