Greenspace logo
Welcome
Climate Space
  • Home
  • Climate Obligation Register
    • Full Report
    • Calendar
    • Monthly Updates
    • Help
  • TCFD Gap Analysis
    • Help
  • Docs
  • »
    Climate Obligation Register
    • Full Report
    • Calendar
    • Monthly Updates
    • Help
  • »
    TCFD Gap Analysis
    • Help
  • Docs

Client Login

Legal Register - Climate Space

  • Select Month:
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • March 2017
    • February 2017
    • January 2017
    • December 2016
    • November 2016
    • October 2016
    • September 2016
    • August 2016
    • July 2016
    • June 2016
    • May 2016
    • April 2016
    • March 2016
    • February 2016
    • January 2016
    • December 2015
    • November 2015
    • October 2015
    • September 2015
    • August 2015
    • July 2015
    • June 2015
    • May 2015
    • April 2015
    • March 2015
    • February 2015
    • January 2015
    • December 2014
    • November 2014
    • October 2014
    • September 2014
    • August 2014
    • July 2014
    • June 2014
    • May 2014
    • April 2014
    • March 2014
    • February 2014
    • January 2014
    • December 2013
    • November 2013
    • October 2013
    • September 2013
    • August 2013
    • July 2013
    • June 2013
Preview Email
August 2013
Congratulations. There are no changes to the legislation or other requirements in your legal register.
 
Recent Publications

BIS

  • Packaging (Essential Requirements) Regulations: draft government guidance notes

DECC

  • Smart metering implementation programme: information leaflet
  • Smart Metering non domestic leaflet
  • Applying for a place within the 400MW cap on new build dedicated biomass projects (Renewables Obligation)
  • Lottery Funding and the non-domestic RHI

Environment Agency

Permitting

  • Shale Gas Exploratory Operations: Technical Guidance
  • Permitting biomass fired combustion plant which opted out of the Large Combustion Plant Directive, under the Industrial Emissions Directive

Waste

  • Waste sampling and testing for disposal to landfill
  • Updated Hazardous Waste Guidance:
  1. Technical Guidance WM2 - Interpretation of the definition and classification of hazardous waste (3rd Edition, August 2013)
  2. Waste Sampling Supplement (Appendix D)
  • Electronic Waste Transfer Notes: Edoc, a UK-wide system being developed by government and waste industry organisations, goes live in January 2014. It will enable you to do away with paper and create, share, sign and store waste transfer notes online. You will be able to search and retrieve your records quickly and easily and create reports for your business.
  • Approved authorised treatment facilities (AATFs) public register 2010 - 2013
  • Approved exporters public register 2010 - 2013
  • WEEE Registered Producers Public Register - 2013
  • End-of-life vehicles (ELV) Authorised Treatment Facilities (ATF) Register - England and Wales

Water

  • Upper Aire flood risk management strategy
  • An Overview of the Approach to Flood Risk Management Planning
  • Sub Catchment Maps have been published for: Northumberland; Tees; Tyne; Wear

Energy

  • Climate Change Levy Reduced Rate Certificates for facilities in the following sectors: Poultry Meat Rearing; Plastics; Metal Forming; Chemicals; Food and Drink; Super Markets; Bakers; Pigs; Eggs and Pultry Meat; Packaging and Industrial Films; Surface Engineering Heat Treatment; Laundries; Aluminium; Agricultural supply; Wallcoverings; Textiles; Textiles Energy Intensive; Ceramics; Meat; Poultry Meat Processing; Printing; Paper; Cold Storage; Dairy; Non-Ferrous Metals; Horticulture; Surface Engineering; Leather
  • Climate Change Agreements Operations Manual: guide for operators of a climate change agreement giving them the information they will need to set up agreements, manage their agreements in the scheme and report theri emissions data at reporting periods
  • CCA operations manual - Appendix H: including and excluding facilities spreadsheet: Spreadsheet to assist customers in the CCA operations manual
  • Climate Change Agreements Operations Manual: Appendix I - target calculator for new entrants: Spreadsheet to assist customers in the CCA operations manual
  • CCA operations manual -Appendix J: new entrants preadsheet
  • CCA operations manual -Appendix K: Novem target unit change (inclusion or exclusion)

Chemicals

  • Perfluorooctane sulfonic acid and its derivatives (PFOS) – managing stockpiles and wastes from exempted uses
  • REACH Annex XVII Restrictions Nonylphenol and its ethoxylates

Wildlife/Biodiversity

  • Managing Japanese knotweed on development sites

IPPC Bureau

  • The second draft of the BREF on Intensive Rearing of Poultry and Pigs (IRPP)
  • The first draft of the BREF on Wood-Based Panel (WBP)
  • The final draft of the BREF on Pulp, Paper and Board (PP)
  • The final draft of the BREF on Refining of Mineral Oil and Gas (REF)
  • The first draft of the revised Large Combustion Plants (LCP) BREF

Planning Portal

  • New National Planning Guidance Online Resource where all national planning practice guidance can be viewed and downloaded...to clarify and reduce planning policy and guidance following the National Planning Policy Framework in March 2012 and the Taylor Review in December 2012. The full website is due to be launched in the autumn and existing guidance will not be cancelled until then

Scottish Government

  • Planning Advice Note 1/2013: Environmental Impact Assessment: New guidance to replace PAN:58 and containing advice on the integration of EIA procedures into the overall development management process
  • Strategic Environmental Assessment Guidance: Scottish Government guidance on Strategic Environmental Assessment
  • Drinking Water Quality in Scotland 2012: DWQR is required under the Act to publish a report on the exercise of the Regulators functions the previous year. This report provides a summary of the Drinking Water Quality in Scotland 2012
  • Key Scottish Environment Statistics 2013
  • Planning Scotland's Seas: 2013 - Possible Nature Conservation Marine Protected Areas Consultation Overview Sustainability Appraisal: This report documents the findings of a Sustainablity Appraisal to accompany the 2013 public consultation on possible nature conservation marine protected areas (pMPAs).
  • Independent Expert Review of the Scientific Case for the Proposal to Designate the Sound of Barra as a Special Area of Conservation (SAC)
  • Consultation on Climate Change (Scotland) Act 2009: Section 63 Form of Regulations for Non-domestic buildings: Consultation Report

 

 
Offences

SEPA revokes Scotgen (Dumfries) Limited’s permit

SEPA has issued a notice of revocation to Scotgen (Dumfries) Limited, the operators of the Dargavel energy from waste plant, to remove their permit for the following reasons:

  • Persistent non-compliance with the permit.
  • Failure to comply with an enforcement notice.
  • Failure to maintain financial provision and resources to comply with the requirements of the permit.
  • Failure to recover energy with a high level of efficiency.

As well as revoking the permit, the revocation notice requires that certain steps are taken to avoid pollution and to return the site to a satisfactory state. This includes a requirement for the waste to be removed.

The Revocation Notice can be withdrawn before it comes into effect (23 September 2013) and Scotgen (Dumfries) Limited is entitled to appeal to the Scottish Ministers against the Notice. If there is an appeal the revocation notice would be set aside until the appeal had been determined. This would mean that the plant could carry on operating until the Scottish Ministers make a decision.

SEPA's Technical Support Manager said:

"Since the plant came into operation we have provided support and assistance to Scotgen (Dumfries) Limited including affording them considerable time and opportunity to demonstrate that this facility can meet the Best Available Techniques, and the specific requirements of European Directives designed to protect the environment. Unfortunately despite this, they have not done so.

The facility started operations more than four years ago, and in that time has never achieved a level of compliance which would give SEPA any degree of confidence that future operation would be any different. The facility has consistently failed to meet any reasonable expectation of environmental performance and the predicted level of energy recovery at approximately 3% is particularly disappointing and unsatisfactory.

SEPA has taken this serious and unusual action of revoking the permit following careful consideration and assessment of the regulatory options available."

Illegal waste operator and company fined £25,000 for illegally dumping waste at a farm near Windsor

Southern Water has been fined £200,000 after discharging raw sewage into the sea, the Environment Agency has said.

Defective pumps at Margate pumping station in Kent led to several discharges of untreated sewage between January and June 2011. The repeated failure of the pumps meant Southern Water was unable to pump the sewage to Weatherlees Works for treatment, and instead discharged it into the sea off Margate.

Canterbury crown court heard that the firm, which serves Kent, Sussex, Hampshire and the Isle of Wight, failed to tell the Environment Agency or the local food authority about the discharges.

Last month the company pleaded guilty to breaching its strict environmental permit and causing avoidable releases of untreated sewage to enter the sea, the agency said.

Andy Stamp, an environment officer at the agency, said: "We take these types of incidents very seriously and will do everything within our powers to safeguard the environment and people affected, and that includes bringing those who harm the environment to account for their actions."

Southern Water said it unreservedly apologised and had spent £1.7m addressing "complex engineering issues" at the pumping station that caused the problems. Another £400,000 was earmarked and plans for another pumping station were being drawn up. The firm said it had supported the local tourist industry with a series of promotional projects.

Geoff Loader, a Southern Water director, said that although the company had failed to operate within its environmental permit, Margate beaches continued to meet European quality standards.

"Importantly, the majority of beaches in the Margate area continue to have water quality sufficient to meet the blue flag standards and all meet European standards. Therefore, although we have breached our permit, we have not caused any deterioration in the water quality of Margate's beaches and, overall, our current treatment system has delivered improvements leading to blue flag water quality," he said.

"However, failures with our plant are not acceptable. We fully understand the importance of water quality to the reputation of Thanet as a leading tourist resort in the UK and we will always work to protect and enhance that."

Illegal waste operator and company fined for illegally dumping waste at a farm near Windsor.

Mr Mark Jones, 49, pleaded guilty to three offences of causing or permitting the unlawful deposit of waste on rented land surrounding his property at Brayfield Farm, Windsor. He was fined £5,000, ordered to pay costs of £4,793.84 and a Victim Surcharge of £120.

Simpson Environmental Services Limited pleaded guilty to three offences of unlawfully depositing waste on the land. The company was fined £20,000, ordered to pay costs of £4,793.84 and a Victim Surcharge of £120.

Mr Jones' operates a working farm shop. Mr Jones rented a further portion of surrounding land from an offshore company.

Simpson Environmental Services holds an Environmental Permit, regulated by the Environment Agency. The permit covers the operation of a waste transfer station in Slough, which is allowed to accept household, commercial and industrial wastes to be sorted and then removed from the site.

Between 2006 and 2011 Environment Agency officers visited the land Mr Jones rented surrounding his farm and found that an estimated total of 57,600 tonnes of waste soils had been brought onto it by Simpson Environmental Services and spread. During site visits Environment Agency officers told Jones and Simpson Environmental Services that permission from the Environment Agency was needed to continue bringing waste onto the site. This would impose controls on the activity to minimise its environmental impact. However, permission was never obtained.

The court heard that payments had been made by Simpson Environmental Services to Mr Jones for accepting the waste onto the rented land amounting to hundreds of thousands of pounds. In sentencing, the Magistrates took into account the huge amounts of money involved.

an EA Environmental crime officer said: “Both Mr Jones and Simpson Environmental Services Limited had been told on a number of occasions that they were acting illegally by tipping waste materials on land designated for agriculture. In this case it occurred on land directly bordering the river Thames and in the immediate vicinity of the Olympic venue at Dorney and close to Windsor Castle.

Increasingly we are investigating the financial gains made by waste criminals where waste is being dumped unlawfully. We will continue to investigate illegal operators and bring them to court no matter how long it takes. Operating illegal waste sites is unacceptable and can have severe detrimental environmental impacts.

People who operate waste sites need to ensure they have an environmental permit in place to do so. In addition, skip operators who pick up skips containing controlled waste are under a statutory Duty of care under the Environmental Protection Act 1990 to deliver the waste to a regulated site."

Toxic Bonfire Party

Piles of waste were stored and then burnt at an illegal site close to the Norfolk to London railway line in Suffolk. The man responsible was fined £28,000.

Firewood Merchant Ian Dale Garnham (44) illegally stockpiled waste and then set fire to it at The Woodyard in Diss, between 3 and 6 November 2012, resulting in the fire brigade being called to the site.

Mr Andrew Logan, prosecuting for the Environment Agency, said a white plume of smoke that smelt noxious and toxic lingered over the site and blew across the nearby railway line.

Investigating officers found an ‘extensive area of the lower yard’ estimated to be 30-40 loads of waste, covered in smouldering waste that in some places was as high as 4 metres.

“The uncontrolled burning of waste is likely to have polluted the air and contaminated the ground and was, in part, financially motivated and he failed to take our advice,” Mr Logan told the court. He said items burnt in the fire included tyres. Tests showed that toxic fumes would have been emitted from the fire due to incomplete combustion.

“Concentrations of copper, lead and zinc in the ash were significantly higher than the background soil levels for England and Wales,” Mr Logan said.

Garnham told Environment Agency officers that he had held a bonfire party and 120 people attended, with the proceeds from the event going to charity. He also said that 90% of the waste burned was green waste which he had brought back to the yard for recycling.

After the hearing, Environment Officer Tom Pickover said: “There was no waste permit for this yard and burning waste is illegal. The effect of the fire was to release toxins into the air and the ground. Everyone who disposes of waste has a duty of care to ensure their waste is handled correctly.”

The bonfire was 116 metres long in diameter, and had a height of between 1 and 4 metres.

Garnham pleaded guilty to the following charge:

disposing of controlled waste by burning in a manner likely to cause pollution of the environment or harm to human health.

Contrary to Section 33(1)(c) and 33(6) Environmental Protection Act 1990.